10-27-2025: Dug 9’ hole in back of building to install 6” pvc outside clean out, cleaned and measured sewer in preparation for lining. 10-28-2025: lined sewer from 3” pvc stack in basement to end of 4” cast in open hole outside approximately 20’, reinstated 2” laundry/floor drain connection. Lined 6” from open hole outside to city main approximately 7’. 10-29-2025: bedded pipe in stone backfilled hole.