10-16-2025: Cleaned and measured sewer in preparation for lining from 3 access points 4 liner installations and x2 connection liners needed. 10-23–2025 Lined from 6” cleanout in parkway 15’ downstream to city main. Lined from cleanout in parkway 75’ upstream. Lined from 6” pvc cleanout near back door 75’ downstream overlapping liner from parkway. Reinstated wye connection from overhead. 10-24-2025 Lined from 4” overhead cleanout in basement downstream approximately 30’ to wye connection. Installed 6x6x6 wye connection liner at lateral to main connection 11’ downstream of cleanout in driveway. Installed 4x4x4 wye connection liner from overhead cleanout.