12-11-2025: tvd and measured sewer in preparation for lining 12-17-2025 Inserted a liner through the existing outside clean-out under the deck extending approximately 97 feet downstream ending just before the city main. Inserted a liner through the existing outside clean out upstream approximately 10’ ending in 4” cast iron. Reinstated two connections.