12-11-2025: tvd and measured sewer in preparation for lining from 6” pvc outside clean out (9’deep) to city main about 105’ 1-6-2025: lined sewer from 6” pvc outside clean out 102’ downstream to city main starting in 6” pvc and ending just short of city main. Reinstated connection at 18’ possible drain tile or