12-16-2024: cleaned and measured fountain drain line in preparation for lining from open pipe in basement to open end drain in fountain. 12-20-2024 Inserted a 6” epoxy liner through the open pipe in the basement extending approximately 70’ upstream to the open pipe in the fountain.