Cleaned sewer line from outside cleanout upstream to overhead cleanout in basement and got measurements in preparation for sewer lining. 3-25-2025: lined sewer from 4” overhead stack in basement 42’ downstream starting liner in 4” cast just downstream of overhead stack tie in and ending in 6” pvc downstream of 6” pvc outside clean out. Reinstated 6” pvc outside clean out.