Arrived back to the home to complete the work. Cut out and removed foam core exhaust pipe for water heater. Supplied and installed new solid core pvc pipe and fittings for the exhaust. Secured all my connections. There are no leaks at this time. Repiped water line on top of water heater. Supplied and installed new brass, copper, pipe and fittings on top of water heater. Supplied and installed new expansion tank, temp and pressure relief valve, and ball valve. Secured all my connections and fill system to check for leaks. There are no leaks at this time. Installed new bonding wire as well. *Installed ball valve for existing sump pump as a one time curtesy. *After new ball valve for pump was installed, trying to turn on sump pump and the existing pump has failed. Supplied and installed new 1/3 HP sump pump for client as well. *Client is now a member.