We arrived back to the home to install the customer supplied rinse station, due to time restrictions, the client has requested that we return first thing in the morning, next Tuesday. Arrived back to the home. Installed customer supplied outdoor rinse station. Drilled holes through the concrete block and existing enclosure. Mounted rinse station. Ran copper piping through the block and sleeved it from the concrete. Supplied and installed winterization station behind rinse station with boiler drain valves. Supplied and install only one ball valve under the kitchen sink for the hot side of the rinse station. Ran white pex piping from up top to the winterization station below. Secured all my connections and turned the home back on and checked for leaks. There are no leaks at this time. *No warranty offered for any customer supplied products. *Full warranty provided on parts and pipe installed by MyGuy Plumbing. *All warranty is voided if customer does not winterize the system prior to t