8-8-2025: Cleaned and measured downspout/kitchen line from downspout to catch basin. Need to use maxi miller to remove remaining roofing tar out of 6” clay the day of lining. We will cut 6” cast downspout down 1’ from top to install liner and reinstall cut piece with non-shear mission coupling. Liner will start at downspout and end just before tee near basin, x2 reinstates upstairs kitchen also basement kitchen. 8-20-25 Inserted a 6” liner through the existing downspout connection on the side of the house extending approximately 40 feet downstream to just before main run leading to the catch basin on the other side of the house. Reinstated two kitchen connections with robotic cutter.