Installed spot repair liner between gap in liners in 6” clay, and did final video inspection from manhole near pit back to starter manhole near rear building. ****found damaged 6” clay pipe and liner during final video inspection 6’ downstream of manhole in middle of rear parking lot where new water service was ran to back building when digging trench for new water sewer was clipped with tractor bucket, needs to be dug up and repiped with new 6” pvc.
Televised sewer from manholes by dock it originate in maintenance shop then goes north for approximately 325 ft ending in manhole before turning to go into the ejector pit for the forced main. Will provide a proposal for lining from manhole on south side by maintenance building to manhole on north side of dock before ejector pit.