• Broke up the concrete floor and excavated the area in the garage near the furnace. •Dug under furnace to alleviate pressure under foundation and installed 4” perforated corrugated pipe. • Installed a 20” wide by 42” deep perforated sump pit in the excavated area and backfilled with ¾” stone with sealed cover. • Installed a sump pump in new pit and ran discharge line through garage and exited through the side wall of garage and out the front of house. • Backfilled excavated area with stone and re-cemented concrete floor. • Removd all debris from the worksite.