Rodded sewer from inside floor clean out approximately 65ft to city main. Heavy roots in clay with a little bit of a belly. Cast is channeled on bottom and looks to be missing pipe. Provide estimate for lining both cast and clay
Televised sewer from inside clean out on stack. Could not get past 62 ft due to roots. Cast iron is very channeled and missing the bottom of the pipe in a couple of areas. Suggest opening the floor in the basement to provide better access then descaling cast iron and then lining from basement to main.