Televised ducts under slab floor. Ducts are pvc with metal fittings. There was no water at the time of the inspection but we can see where water is entering the ducts at a connection in the back of the house between the kitchen and the master bedroom. Downspouts an d gutters need to be corrected and possible grading. If after that is done water is still getting into the system then a sump pit and pump is suggested in the back of the unit outside.
Descaled the 4” cast iron sewer lines on the northeast and the northwest sides of the house approximately 30’ in total. Hydro jetted the scale out of the sewer lines. Lined from septic tank 35’ back to toilet connection, also from overhead stack out to septic tank 12’.
Sewer line video inspection service call. Televised two sewers from two septic tanks. Sewers are both scaled. Suggest descaling then lining.
Televised sewer from inside and outside clean out. There is on,tone area at the pvc to clay connection that has heavy roots. Suggest installing a spot repair liner in that area.