Inserted a 4” liner through the open hole extending upstream approximately 55 feet back into the building ending prior to the elbow for the stack. Reinstated four connections. Applied a 3 mil thick layer of epoxy to approximately 20’ of 4” cast iron pipe from cleanout in woman’s bathroom and from five toilet collars. (3 in womans and 2 in men’s)