Cleaned and measured sewer in preparation for lining from flood control to about 45’ downstream ending before city main lining a few joints past where root was growing into 6” clay pipe at joints. 7-24-25 Inserted a 6” liner from flood control starting past the ejector pit connection and ending 45’ downstream past where roots were growing into 6” clay pipe joints.