Replaced meter base, installed service disconnect, replaced wire to panel. Updated grounding and bonding, including intersystem bond, ground rod, and surge protection. GFCI Protection in all required areas. Un-bonded grounds and neutrals in panel and bonded them in service disconnect. Verified voltage and functionality.