7415 Whitehall St. #119
Richland Hills, TX 76118
682-262-5759

Job Locations
for azle, tx


Map of Azle TX
Alex C.

Alex C.


Job Checkin

Arrived to look at issue with outlets not operating after the home owner was pressure washing the pack patio and they lost power to the kitchen outlets and back porch outlets. Upon arrival tested the outlet and the gfci were able to be reset and resume operation. Provided a quote to replace the federal pacific panel located in the garage and bring the entire service up to current 2023 NEC code. We will install all safety devices such and the ground system and whole house surge. Oncor will need three days prior notice for disconnect/reconnect. As well as quoting the panel the home owner needs a 40 amp circuit installed to have a new induction cooktop installed as the current circuit is only 20 amp. Quotes are good for thirty days.

Arrived to look at issue with outlets not operating after the home owner was pressure washing the pack patio and they lost power to the kitchen outlets and back porch outlets. Upon arrival tested the outlet and the gfci were able to be reset and resume operation. Provided a quote to replace the federal pacific panel located in the garage and bring the entire service up to current 2023 NEC code. We will install all safety devices such and the ground system and whole house surge. Oncor will need three days prior notice for disconnect/reconnect. As well as quoting the panel the home owner needs a 40 amp circuit installed to have a new induction cooktop installed as the current circuit is only 20 amp. Quotes are good for thirty days. Arrived to look at issue with outlets not operating after the home owner was pressure washing the pack patio and they lost power to the kitchen outlets and back porch outlets. Upon arrival tested the outlet and the gfci were able to be reset and resume operation. Provided a quote to replace the federal pacific panel located in the garage and bring the entire service up to current 2023 NEC code. We will install all safety devices such and the ground system and whole house surge. Oncor will need three days prior notice for disconnect/reconnect. As well as quoting the panel the home owner needs a 40 amp circuit installed to have a new induction cooktop installed as the current circuit is only 20 amp. Quotes are good for thirty days.