7415 Whitehall St. #119
Richland Hills, TX 76118
682-262-5759

Job Locations
for fort worth, tx


Map of Fort Worth TX
Tyler B.

Tyler B.


Job Checkin

1. Fix incorrect grounding system with plugs that have 3-prong plug 2. Install GFCI/ AFCI breakers per code to protect 3-prong plug 3. Major troubleshoot for breakers and outlets that trip 4. Replace 60 amp electrical panel (lifetime warranty) 5. Install ground rod at panel per code 6. Pigtail 12 openings aluminum to copper plug 7. Add outlet for water heater flood stop (free) 8. Today’s work will be at no charge *Electrical panel is being fed from a 60 amp breaker and needs to be upsized. We will not be responsible for breakers tripping if we go back with a 60* *Does not include digging trench* *10% off with minimum of a 5 year warranty* Installed dual function breakers on circuit inside main panel to give two wire system a form of grounding protection. Replaced sub panel on outside building and grounded with ground rod. Redeviced entire detached building with new outlets and switches and used pigtails wire nuts for aluminum to copper devices.

1. Fix incorrect grounding system with plugs that have 3-prong plug
2. Install GFCI/ AFCI breakers per code to protect 3-prong plug
3. Major troubleshoot for breakers and outlets that trip 
4. Replace 60 amp electrical panel (lifetime warranty) 
5. Install ground rod at panel per code
6. Pigtail 12 openings aluminum to copper plug 
7. Add outlet for water heater flood stop (free) 
8. Today’s work will be at no charge 

*Electrical panel is being fed from a 60 amp breaker and needs to be upsized. We will not be responsible for breakers tripping if we go back with a 60*
*Does not include digging trench* 
*10% off with minimum of a 5 year warranty* 

Installed dual function breakers on circuit inside main panel to give two wire system a form of grounding protection.  Replaced sub panel on outside building and grounded with ground rod.  Redeviced entire detached building with new outlets and switches and used pigtails wire nuts for aluminum to copper devices.  
1. Fix incorrect grounding system with plugs that have 3-prong plug
2. Install GFCI/ AFCI breakers per code to protect 3-prong plug
3. Major troubleshoot for breakers and outlets that trip 
4. Replace 60 amp electrical panel (lifetime warranty) 
5. Install ground rod at panel per code
6. Pigtail 12 openings aluminum to copper plug 
7. Add outlet for water heater flood stop (free) 
8. Today’s work will be at no charge 

*Electrical panel is being fed from a 60 amp breaker and needs to be upsized. We will not be responsible for breakers tripping if we go back with a 60*
*Does not include digging trench* 
*10% off with minimum of a 5 year warranty* 

Installed dual function breakers on circuit inside main panel to give two wire system a form of grounding protection.  Replaced sub panel on outside building and grounded with ground rod.  Redeviced entire detached building with new outlets and switches and used pigtails wire nuts for aluminum to copper devices.