James returned and performed the below Task includes -Evacuation of existing Freon in system -Removal and installation of new suction line port -Installation of new in line filter dryer -Pressure testing for further leaks -Triple evacuation of system -12LBS R-410A (may not take entire charge this is worse case scenario) System is now cooling as designed client is happy