7-5-2024: cleaned and measured sewer in preparation for lining. 7-8-24 -Inserted a 6” liner through the existing outside clean-out extending approximately 58 feet to just before the city main. Inserted a 4-6” liner through the existing outside clean-out extending upstream approximately 6ft ending in the 4" cast iron.