Estimate for lining 35ft of 6" sewer
We lined the sewer from an outside clean out, out to the city main, on a new construction house. The city requires the sewer be replaced with PVC or lined, in this case the sewer ran 24’ deep between two house’s and would have been nearly impossible to dig and replace we were able to come in and easily line the pipe from the 6” sewer clean out that was recently installed.