Rhythm -power company Next Tuesday -disconnect @9-2 1. Run power from main house 2. Run conduit under slab 3. Install 100 amp sub panel (at later date) 4. Install ground rod at sub panel 5. Replace 225 amp electrical panel (lifetime warranty) 6. Install 200 meter base (lifetime warranty) 7. Install ground rod for main house 8. Install whole home surge (lifetime warranty) 9. City permit and inspection 10. Install 225 amp disconnect (lifetime warranty)