-install 4 owner furnished faucets, including three laboratory faucets, and one kitchen faucet. -install 2 owner furnace shower valves including one in the master and one in the hall bath. -replace 9 multi-turn shut off valves underneath sinks and behind toilets with new quarter turn valves and flex lines (free) -replace multi term style washing machine valves with quarter color-coded valves and flex lines (free) -replace multi-turn ice maker valve with new quarter turn valve. -replace old garbage disposal with standard 1/2 hp disposal. -Manufacture warranty on OWNER SUPPLIED MATERIALS. -5 year warranty on our equipment. Excavate 25 feet in length for sewer yard line replacement reroute line around large tree. Bore under side walk and dig down approx 8 feet to connect to city connection near curb. Not responsible for landscaping including trees, bushes, etc. 15 year warranty on new sewer line. Installed approximately 25 feet of new sewer line and customers front yard and connected