Job Site Report: Arrived on site. The customer requested installation of an electric vehicle (EV) charger inside the garage. Will return on Wednesday, October 15 to complete the work. Scope of Work: • Install a pass-through panel near the existing 200-amp disconnect. • Run EMT conduit inside the garage to feed a Tesla hardwired car charger. • Pull a permit for the new pass-through panel installation. • Confirmed that the disconnect uses a four-wire system connected to the main panel, with grounds and neutrals separated. The system includes a #4 ground wire and a #4 cold-water bond leading to the disconnect. • Install a customer-supplied whole-home surge protector on the pass-through panel. Additional Notes: Inspected smoke detectors with the customer. The home has hardwired smoke detectors in every bedroom and hallway, and they are interconnected. If any detectors are nonfunctional due to age, replacements will be completed at a later date using cus