Have any feedback for us? We'd love to hear it! Call us at (610) 595-9072 and let us know how we are doing.
Repiped intake and exhaust according to the fact that the homeowners plan on building a deck to the right. I left fittings unglued in case we need to pipe in a different way. There are (2) shower heads that have slightly low pressure since the boiler install was done. One of the shower heads is new including the plumbing (was replaced 3 weeks before we did boiler install). Remaining fixtures in house water pressures in good. She said she will investigate the strainers and shower heads herself. System operating well at this time.