Have any feedback for us? We'd love to hear it! Call us at (610) 595-9072 and let us know how we are doing.
Recovered refrigerant and disconnected, removed and disposed of furnace and ac. Installed new furnace on furnace feet, installed new vent piping, reconnected gas line, adapted to existing return metal, created new supply transition. Sealed supply transition. Flushed and pressure tested line set. Installed new coil and new outdoor unit on new pad. INstalled new disconnect box and wiring outside. Installed new condensate drain system with condensate pump and EZ trap. Started up and commissioned new equipment. Tested heating and cooling operation. Filled out all forms. Left unit in Cooling Mode set to 70 degf.