Arrived onsite for maintenance on 4 systems. Performed inspection of the performance, mechanical, and safety systems. Started in suite 202. Confirmed operation of all systems. Cleaned washable filters on 3 mini split cassettes. Changed 20x20x1 ceiling filter. Measured temperature drop of 20 degrees on the big unit. 23 degrees in the small unit. 17 degrees on the ceiling split system.