Removed old boiler installed new crown velocity boiler. Installed four new zones plus an indirect tank was existing. Piped in indirect tank the proper way on auxiliary. Installed magna clean, expansion tank, spiral vent, Purge setup, with three separate circulator pumps. Pumps also included four zone valves. Everything is isolated and operating at this time. Ran 2-in PVC outside vented proper distances from Windows and doors.