Have any feedback for us? We'd love to hear it! Call us at (610) 595-9072 and let us know how we are doing.
Installed new Goodman 80k furnace. Installed 6 in transition because of height difference between new furnace and coil. Installed new ez trap and wired to break R. Installed new switch and outlet. Adapted to existing gas line. Installed new propane conversion kit. Installed new intake drain kit. Adjusted propane to manufacture spec and dip switches to manufacture specs. Tested system in heating and cooling. System working properly and work area cleaned. Rest of payment for heat exchanger replacement.