Have any feedback for us? We'd love to hear it! Call us at (610) 595-9072 and let us know how we are doing.
1st floor. Removed and reclaimed old equipment. Installed new pad, disconnect, line set. Brazed in new coil and outdoor unit. Installed new gas furnace. Pressure tested line set, no leaks found.Evacuated line set to 267 microns. Reconnected gas, electric, condensate, and ductwork. Installed new 16/20/1 filter. Installed ez trap and condensate pump. Sealed hole in floor and ran vinyl into sump pump. Charged system and tested in heat and cool. Delta t 21. System running perfectly at time of install. 2nd floor. Removed and reclaimed old equipment. Installed new pad, disconnect, and flushed line set. Brazed in new coil and outdoor unit. Installed new gas furnace. Pressure tested line set, no leaks found. Evacuated line set down to 256 microns. Reconnected gas, electric, condensate, and ductwork. Reinstalled 16/25/1 filter. Installed ez trap and wet switch. Charged system and tested in heat and cool. Delta t 25. System running perfectly at time of install.