Have any feedback for us? We'd love to hear it! Call us at (610) 595-9072 and let us know how we are doing.
Installed new customer supplied air handler and heat pump. Installed new supply plenum. Installed new condensate line. Made all necessary high and low voltage connections. Flushed existing line set and pressure tested system to 300 psi and evacuated below 500. Added 23 ounces. Tested system in heating system in heating and cooling. System working properly.