Have any feedback for us? We'd love to hear it! Call us at (610) 595-9072 and let us know how we are doing.
Install new vent pipe from boiler to power venter. Install new pipe from venter through window opening to the outside and cement opening. Run new wire to power venter location and connect wiring to venter. Install new control interlock kit for boiler and complete all wiring connections. Test operation of system at completion. Installed 360 degree manual resetable thermal switch and performed combustion test.