Have any feedback for us? We'd love to hear it! Call us at (610) 595-9072 and let us know how we are doing.
Drained 2nd floor boiler loop. Removed bathroom hydronic baseboard. Capped off loop to baseboard in basement boiler room. Removed and replaced leaking 3/4 elbow with new progress fittings. Refilled and purged air from boiler as well as possible without radiator in place. 9/27/19 installed 2 ft baseboard and purged air from loop. Everything is getting hot, no leaks.