Removal of back of vanity and drywall to access and repair cold water piping in wall. Repair will include new isolation valve. Technician repaired leak and installed new isolation valves both hot and cold side. Repressurized home and tested work. Work is leak free. While technician waited for glue to dry, he removed toilet and set into tub and shimmed toilet flange up 1/2” to accommodate new tile flooring that will be installed.