Install new toilets in both main level bathrooms in the house, 2 toilets I’m the guest house, 2 kitchen faucets in the main house, air switch for garbage disposal in the main house, shower valve/trim in master bathroom shower, 10 emergency shutoff valves in both homes, 2 strainer baskets in main house kitchen and new top mount sink in main house powder room. Vern’s plumbing has a standard 1 year warranty on all labor Day 2- install 2 shower heads, shower valve, wire up the air switch, replace 4 emergency shutoff valves in the main home and install deeper strainer basket at kitchen sink. Had plans on replacing the emergency shutoff valves in the upstairs hallway bathroom as a courtesy but whoever installed them left no room and I can’t reuse the existing gold nut because my shutoff valves are chrome. Jamie does not want drywall removed if it’s not necessary, valves are working just fine at this time. Temporarily installed chrome Pfrister shower heads. Will have to return to install br