Cleaned and measured sewer in preparation for lining from 6” clay clean out downstream of flood control starting liner upstream of flood control system (need to remove pump in flood control and lift flapper) and ending 66’ upstream in patch liner(6”x5’) needed near catch basin. Also line downstream with spot repair liner(6”x5’) to cover first 2 joints near clean out where tree root was in 6” clay.