Inserted a 4” patch liner downstream through the existing outside clean-out approximately 9ft in length and positioned it over the cracked clay tile pipe at the 32ft mark. Inserted a 4” patch liner downstream through the existing outside clean-out approximately 5 ft in length and positioned it over the cracked clay tile pipe at the 9ft mark.