10-7-25 Start the fall heating system check out Engineered air unit replace filter filters grease the blower motor and blower wheel pillow bearings checked operation of the blower system only. Check the electrical components Did a visual inspection of the RTU compressor area and electrical components. System air compressor. Checked pressures and operation Checked electrical components Check the oil level Check the compressor motor amperage matches the rating on the compressor itself