4-14-2025: Cleaned and measured sewer in preparation for lining from 6” pvc clean out in back patio (3’2” deep) downstream 60’ ending in 6” clay before city main at 87’. 4-28-2025: lined sewer from 6” pvc clean out in back patio 60’ downstream ending just past hole in clay pipe near front of building, reinstated x1 4” pvc connection, did not reinstate x2 6” clay connections entire house came through new pvc connection and downspouts came in upstream of clean out in new pvc.