Arrived to job to remove cast iron radiators and update system to all baseboard. We drained and isolated the system we removed the radiators we cut chase way and ran new pex line with straps and nail plates we capped upstairs lines and stubbed out all all copper and removed necessary molding. Need to return once walls are sheetrocked and repaired to install the baseboard and repipe boiler.