Removed old natural gas. 80% hot air furnace. Installed new two-stage 80% 120,000 BTU natural gas. Hot air furnace. Adapted smoke pipe 4-in 26 gauge redid 3/4 PVC drains relocated condescate pump rehooked up high voltage and low voltage wiring. Rehooked up gas piping adapted new furnace to Old coil.