Arrived on site to check out the boiler for a lockout occurrence. The boiler is running and staying on now that it is colder out and all of the pumps are running. I put together a material list and will provide pricing to correctly pipe the boiler with a primary secondary setup to maximize the flow through the heat exchanger.