Drain system library. Installed new piping for primary and secondary on high efficiency. Boiler. Piping was installed incorrectly from previous company. Tested. Everything is operational at this time. Installed 4-in and a quarter press ball valves and installed new purging setup in basement and on second floor for second floor zone. Purged out second floor zones.