This task will be digging up to the troubled area and replacing up to a 10 ft section of pipe, we will eliminate the pipe and adding copper new plastic pipe along with 2 elastomeric fittings connecting back onto the existing pipe. There are utilities in the way and this will cover the difficult access to the sewer. This task involves entering the public street to access the point where the sewer line transitions to clay, which is located 5 ft from the curb in the roadway. The scope of work includes obtaining all required city permits and coordinating any subcontractors necessary to complete the street repair. This task also covers all labor, materials, and associated costs required to perform the work and restore the street to city standards.