*&*)*&(*(=(==(=;===(&)&(&)***$**$*#*#*-* D 10:30, a 11:18, finished 12:18, site survey 12:18 to 12:57) ****((*)*(&(&(*)*&)&)*)(*)**(**(=)(*****&($*($($*$( Today when I arrived I was shown the breakroom where water had been dripping through the ceiling. I accessed the roof and located the unit above the breakroom (Carrier, SE unit). The drain was checked and found to be obstructed. I removed the obstruction, refilled the condensation drain trap and operated the unit. It is cooling within the proper range and the condensation started flowing through the drain again. While on-site I checked temperatures on the other three rooftop units. All of the units on the roof are cooling within their proper ranges. Today I also performed a site-survey and included the four rooftop units to provide a quote for twice year maintenance as was requested. Thank you, Jon Tech notes: S.E. Unit clogged drain (unclogged). Checked temp splits all four no greater than 21, no less than 17