During this visit the rooftop units were checked and the filters were replaced. The units were cycled to confirm that they are operating normally. The east carrier unit had a condensate drain line that had been knocked apart and was reattached today. A Lennox unit (rtu #2) had the blower motor belt replaced as well as the men’s bathroom exhaust fan belt was replaced. The mini-split that serves the conference room had dripped condensation from the suction line insulation. The insulation to this unit was secured today. The mini-split, exhaust fans and all roof top units are functioning at this time. Thank you, Jon