12-11-2024: measured sewer in preparation for lining from 6” pvc clean out on right side of house (5’11” deep) about 140’ to city main starting in pvc near clean out and ending liner at city main need to line into main and cut liner back to tap. 2-6-25 Inserted a 6” liner through the existing outside clean-out extending approximately 140 feet downstream ending at the connection to the city main. Reinstated one connection.