Tvd sewer with pan and tilt camera to verify dead connection lateral sewer goes to cross at city main drops down at cross into main and is blocked off straight ahead down stream and also blocked off on top at to 12 o’clock position. We can not patch or line at cross liner would end just short of cross connection.