Arrived on site for installation of Fujitsu ductless system with matching ductless condenser and indoor head unit. upon arrival greeted customer explain scope of work. ran drop cloths through designated area of work to ensure cleanliness. removed the old head unit inside successfully. new bracket plate was mounted successfully and leveled. successfully ran line sets from head unit to ductless condenser outside ensuring connections were sealed tight. leak-tested joints. no leaks to be found anywhere. outdoor ductless condenser was successfully leveled off and distanced from house to code. system was put under a nitrogen pressure test. pressure test was successful. system held pressure. a vacuum was performed on the system to ensure zero moisture throughout the unit and provide peak efficiency. vacuum was successful and brought down below 500 microns. tested system for all its functionalities. everything is operational at this time. no further notes.