Installed new 90% hot air propane gas furnace. We removed the old system set and leveled the new furnace. We adapted mounted sealed all the ductwork. We piped in gas , flu and drain and checked for leaks. We converted unit to propane and left natural gas conversion next to furnace. We wired and high and low voltage. We ran unit insured everything was operating properly. Everything is operational at this time.